Export Packing and documents China Machinery Group — Shanghai
Rows of CMG impact roller drums staged in the yard before dispatch
Drums are staged in the yard before dispatch. Each shipment's lashing plan and rust protection are agreed before loading.

Machines of this size are not posted like a parcel. A drum, a tractor or a complete set each bring their own packing, lifting and documentation questions, and the answers decide the shipping date more than the production schedule does. This page sets out what we agree with you before anything is loaded.

What actually ships

Three typical shipments: a drum on its own, for a customer who already runs a suitable tractor; a tractor on its own, for a fleet adding capacity; and a complete set, where the drum, tractor, hitch and spare parts are matched in the factory before dispatch. Each has a different load plan, so the quotation states which one is being priced.

Packing

Drum and tractor are cleaned, drained where required and treated against rust for sea air. The drum is lashed at its designated points; the polygonal shell is protected so that the edges are not damaged by the lashings themselves. Wheels, tips and any spare drum set are packed separately and listed on the packing list. Loose items inside the cab are removed and crated.

Drum width decides the load: a drum that will not sit inside a standard container goes on a flat rack or ships as breakbulk, and that changes both the freight cost and the lashing plan. If you intend to move the machine onwards by road, tell us the road legal width in your market at quotation stage, because it may change the drum specified.

Port and terms

Shipments leave from Shanghai. The load port and the exact terminal are confirmed when the booking is made, since flat rack and breakbulk space is allocated per sailing rather than per order.

The commercial terms are quoted as FOB Shanghai, CFR or CIF to your port, whichever you ask for. Insurance, inland haulage in your country, import clearance and duty sit outside our scope unless the quotation says otherwise in writing.

Documents

A standard set accompanies the shipment: commercial invoice, packing list, bill of lading, and certificate of origin where the destination requires one. Where the import regime requires a pre-shipment inspection or a specific certificate, that requirement has to be known before production ends — a certificate obtained after the container has sailed is not a certificate at all.

Machine plates, manuals and spare-parts lists are supplied in English as standard.

What decides the date

Lead time is set by three things: whether the drum is a standard class or a special polygon, whether the tractor is in stock or built to order, and whether the destination requires inspection before loading. A standard drum and tractor pair and a special five-sided drum with a matched tractor are not the same lead time, and quoting one date for both is how delays start.

Before you ask for a shipping date

Send the destination port, the terms you want, whether the drum ships alone or with a tractor, the road width limit in your market, and any import inspection requirement. With those five answers the shipping plan stops being an assumption.

What we need to plan a shipment

  • Destination port and preferred Incoterm
  • Drum only, tractor only, or complete set
  • Road legal width and weight limits at destination
  • Import inspection or certificate requirements
  • Required on-site date and any site access limit
  • Spare parts and wear items to include